Studies on some hundred projects throughout United States showing that 17 per cent of time is lost because of insufficient supply and faulty operation of hauling equipment; intensive analysis of accumulated field records of production studies made on going projects by engineers of division of management of Bureau of Public Roads; causes of low production; hauling operations; plan of good yard layout; time analysis of turntable operation; hauling speeds; disadvantages of contract hauling. See also Engineering Index 1930, p. 1529. (see also - nos. 5 May 1931, pp. 71-77; Pub. Roads, vol. 11, no. 12, Feb. 1931, pp. 247-257 and 260, 9 figs.; and Construction Methods, vol. 13, nos. 5 and 6, May 1931, pp. 50-51, and June, pp. 52-55, 16 figs)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Truck operation and production in concrete paving work


    Weitere Titelangaben:

    Contractors Engrs. Monthly


    Beteiligte:
    Anderson, A.P. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1931


    Format / Umfang :

    5 pages


    Anmerkungen:

    13 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Truck operation and production in concrete paving work

    Anderson, A.P. | Engineering Index Backfile | 1931


    Truck operation and production in concrete paving work

    Anderson, A.P. | Engineering Index Backfile | 1931


    Batching plant in concrete paving work

    Anderson, A.P. | Engineering Index Backfile | 1932


    Batching plant in concrete paving work

    Anderson, A.P. | Engineering Index Backfile | 1932


    Engineering truck chassis and turnout paving and replacing engineering truck

    XU XIJIAN / LIN HONGWU / JIAO WEIGANG et al. | Europäisches Patentamt | 2022

    Freier Zugriff