Studies on some hundred projects throughout United States showing that 17 per cent of time is lost because of insufficient supply and faulty operation of hauling equipment; intensive analysis of accumulated field records of production studies made on going projects by engineers of division of management of Bureau of Public Roads; causes of low production; hauling operations; plan of good yard layout; time analysis of turntable operation; hauling speeds; disadvantages of contract hauling. See also Engineering Index 1930, p. 1529. (see also Contractors and Engrs. Monthly, vol. 22, nos. 5 and 6, May 1931, pp. 71-77, and June, pp. 55-59, 13 figs; and Construction Methods, vol. 13, nos. 5 and 6, May 1931, pp. 50-51, and June, pp. 52-55, 16 figs)
Truck operation and production in concrete paving work
Pub Roads
Public Roads ; 11 , n 12 ; p 247-257 + 260
1931
9 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Truck operation and production in concrete paving work
Engineering Index Backfile | 1931
|Truck operation and production in concrete paving work
Engineering Index Backfile | 1931
|Batching plant in concrete paving work
Engineering Index Backfile | 1932
|Batching plant in concrete paving work
Engineering Index Backfile | 1932
|Engineering truck chassis and turnout paving and replacing engineering truck
Europäisches Patentamt | 2022
|