Scheme comprises 200 km of main line track and 50 km of sidings; also includes new line, which connects central and east stations in Warsaw through tunnel 1 km long and by bridge over Vistula; electric energy for operating lines taken from existing industrial supply system at 35,000 v and 50 cycles and converted in six substations to d-c at 3000 v. (See also Engineering v 142 n 3702 Dec 25 1936 p 696; Engineer v 162 n 4224 Dec 25 1936 p 692; Elec Ry Traction (Supp to Ry Gaz) Jan 8 1937 p 85-6; Metropolitan-Vickers Gaz v 17 n 292 and 293 Aug 1937 p 44-8 and Sept p 67-72)
Electrification of Warsaw suburban railways
Passenger Transport J
Passenger Transport Journal ; 76 , n 1928
1937
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of Warsaw suburban railways
Engineering Index Backfile | 1937
Electrification of Warsaw suburban railways
Engineering Index Backfile | 1936
Electrification of Warsaw suburban railways
Engineering Index Backfile | 1937
Electrification of Warsaw suburban railways
Engineering Index Backfile | 1936
Electrification of Melbourne suburban railways
Engineering Index Backfile | 1920