Scheme comprises 200 km of main line track and 50 km of sidings; also includes new line, which connects central and east stations in Warsaw through tunnel 1 km long and by bridge over Vistula; electric energy for operating lines taken from existing industrial supply system at 35,000 v and 50 cycles and converted in six substations to d-c at 3000 v. (See also Engineering v 142 n 3702 Dec 25 1936 p 696; Elec Ry Traction (Supp to Ry Gaz) Jan 8 1937 p 85-6; Metropolitan-Vickers Gaz v 17 n 292 and 293 Aug 1937 p 44-8 and Sept p 67-72; Passenger Transport J v 76 n 1928 June 18 1937 p 302-8)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Electrification of Warsaw suburban railways


    Weitere Titelangaben:

    Engineer


    Erschienen in:

    Engineer ; 162 , n 4224


    Erscheinungsdatum :

    1936


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Electrification of Warsaw suburban railways

    Engineering Index Backfile | 1937


    Electrification of Warsaw suburban railways

    Engineering Index Backfile | 1937


    Electrification of Warsaw suburban railways

    Engineering Index Backfile | 1937


    Electrification of Warsaw suburban railways

    Engineering Index Backfile | 1936


    Electrification of Melbourne suburban railways

    Engineering Index Backfile | 1920