Chicago and North Western relaid 10 1/2 track miles of 100-lb and 110-lb rail in high speed center track of 3-track main line between Clybourn station in Chicago and Wilmette, Ill, with 115-lb continuous welded rail; using Oxweld pressure welding machine, road fabricated 39-ft rails into various length ranging from 546 to 741 ft at West Chicago, transported them on flat cars to unloading site, and laid them with aid of two Meco power rail layers.
Suburban track gets "ribbonrail"
Ry Eng Maintenance
Railway Engineering and Maintenance ; 47 , n 1
1951
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
IuD Bahn | 2006
|Tema Archiv | 1995
|Track inspection gets high tech
IuD Bahn | 2012
|British Library Online Contents | 1999
The track construction of suburban and interurban electric railways
Engineering Index Backfile | 1902
|