Reconstructed 1560-ft long crossing of Hackensack River in New Jersey will contain 18 plate girder spans of which 16 are original; bascule will be converted to through truss that will clear water by 50 ft; bridge will carry 4 lanes of east-bound traffic, and neighboring new bridge will handle west-bound traffic; cutting of deck, raising of spans, and operation of cranes described.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    State saves year and $ 2 million by rebuilding old bridge


    Weitere Titelangaben:

    Eng News-Rec


    Erschienen in:

    Engineering News-Record ; 172 , n 11 ; p 30-32


    Erscheinungsdatum :

    1964


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Illinois Saves $1.5 Million with Bridge Overcoat

    British Library Online Contents | 1993


    McPherson County Saves $1 Million a Year

    British Library Online Contents | 1997


    PC-based system saves refinery $2 million/year

    British Library Online Contents | 2002


    Rebuilding London Bridge

    Abbott, Jame | IuD Bahn | 2011


    LA Saves $10 Million with 100% Rap Recycling

    British Library Online Contents | 1995