Safety record achieved by M.A.Gammino Construction Co in handling 680, 000 cu yd of rock excavation on Connecticut Turnpike project; excavation was handled by three basic spreads; cut was side hill involving fissured trap-rock removal into bluff immediately alongside railroad right-of-way; it was decided to take cut down in benches of about 24 ft; blasting was done in millisecond delay patterns.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Berms helped protect railroad in blasting Turnpike cut


    Weitere Titelangaben:

    Roads Streets


    Erschienen in:

    Erscheinungsdatum :

    1957


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Vehicle Redirection Effectiveness of Median Berms and Curbs

    N. J. DeLeys / D. J. Segal | NTIS | 1973


    Influence of Berms on Wave Run-Up on Sloping Seadykes

    Wang, Z. / Gruene, J. / Brazilian Water Resources Association | British Library Conference Proceedings | 1995


    Massachusetts turnpike

    Callahan, W.F. | Engineering Index Backfile | 1958


    NUMERICAL MODELLING OF PIPELINE LATERAL RESISTANCE IN ROCK BERMS

    Thusyanthan, I. / Macaro, G. / Mesmar, S. et al. | British Library Conference Proceedings | 2020