Introduction of electric traction between Shenfield and Southend-on-Sea in Eastern Region of British Railways on Dec 31, 1956, marked completion of scheme, first part of which was placed in operation in 1949; power supply obtained from Eastern Electricity Board at 33 kv three phase; rolling stock consists of 32 all steel 4-coach multiple unit sets; control and protection. (See also Engineer v 203 n 5268 Jan 11 1957 p 68-9)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Railway electrification continued


    Weitere Titelangaben:

    Engineering


    Erschienen in:

    Engineering ; 183 , n 4739


    Erscheinungsdatum :

    1957


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Railway electrification continued

    Engineering Index Backfile | 1957


    Railway electrification

    Rao, T.S. | Engineering Index Backfile | 1956


    Railway electrification

    Engineering Index Backfile | 1931


    Railway electrification

    Engineering Index Backfile | 1928


    Railway electrification

    McLean, G.O. | Engineering Index Backfile | 1943