Article describes how Union Pacific Railroad employed power operated earth drill effectively, where driving piles would have been difficult.
Preboring pile holes simplified this falsework problem
Ry Eng Maintenance
Railway Engineering and Maintenance ; 37 , n 8
1941
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1893
Bailey falsework for truss bridge repairs
Engineering Index Backfile | 1950
|Erecting seven simple spans without falsework
Engineering Index Backfile | 1924
Falsework on wheels places railroad bridge in halves
Engineering Index Backfile | 1936
Viaduct alterations without the use of falsework
Engineering Index Backfile | 1899
|