Welding operations must be carried out under conditions which will enable classification society concerned to give shipowner reasonable assurance that structure is sound; possible by cooperation between builders and surveyors, to obtain required assurance, provided proper scheme of operations is adopted and rigidly enforced; illustrations of current practice. (See also - (discussion) p 428-86; Welding J v 30 n 354 and 355 Mar 1933 p 90 (discussion) Apr p 115-6; Metallurgia v 7 n 41 Mar 1933 p 169; Sheet Metal Industries v 6 n 12 Apr 1933 p 824; Shipbldr and Mar Engr v 40 n 277 Apr 1933 p 193-6; Machy Market n 1691 and 1692 Mar 31 1933 p 19-20 and Apr 7 p 21-3; Shipbldg and Shipg Rec v 41 n 10 Mar 9 1933 p 245-6; and editorial comment in Engineering v 135 n 3507 Mar 31 1933 p 359-60)
Electric arc welding in ship construction
Instn Engrs Shipbldrs Scotland
1933
39 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electric welding in ship construction
Engineering Index Backfile | 1940
Electric welding in ship construction
Engineering Index Backfile | 1932
Electric welding in ship construction
Engineering Index Backfile | 1929
|Electric arc welding in ship construction
Engineering Index Backfile | 1932
|Electric arc welding in ship construction
Engineering Index Backfile | 1932
|