Costs are considered ultimate controlling factor; high cost of electrification is due to two items, cost of distribution system and higher cost of electric as compared with steam-locomotives; purchased power is considered as reliable as company's generated power and choice between both is merely matter of comparative costs; some thoughts on standardization.
Railroad electrification economics
Elec. World
Electrical World ; 93 , n 18
1929
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1928
|Engineering Index Backfile | 1925
Engineering Index Backfile | 1919
|Engineering Index Backfile | 1930
|