Information on centralized traffic control system used on Chicago, Burlington and Quincy to reduce first costs in proportion to requirements for operation of 10 to 12 trains daily; power switch at one end of each siding and spring switch at other end, is main feature. (See also Ry Signaling and Communications v 52 n 4 Apr 1959 p 13-17)
Burlington installs modified CTC
Ry Age
Railway Age ; 146 , n 24
1959
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Burlington installs modified CTC
Engineering Index Backfile | 1959
Burlington installs extensive new electric interlocking
Engineering Index Backfile | 1932
|Burlington installs new wayside and cab signaling
Engineering Index Backfile | 1954
Burlington installs new wayside and cab signaling
Engineering Index Backfile | 1954
Burlington installs extensive interlocking at Kansas City
Engineering Index Backfile | 1951