Information on centralized traffic control system used on Chicago, Burlington and Quincy to reduce first costs in proportion to requirements for operation of 10 to 12 trains daily; power switch at one end of each siding and spring switch at other end, is main feature. (see also Ry Age v 146 n 24 June 15 1959 p 18)
Burlington installs modified CTC
Ry Signaling Communications
Railway Signaling and Communications ; 52 , n 4
1959
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Burlington installs modified CTC
Engineering Index Backfile | 1959
Burlington installs extensive new electric interlocking
Engineering Index Backfile | 1932
|Burlington installs new wayside and cab signaling
Engineering Index Backfile | 1954
Burlington installs extensive interlocking at Kansas City
Engineering Index Backfile | 1951
Burlington installs new wayside and cab signaling
Engineering Index Backfile | 1954