Project, described from points of view of user and operator, is under construction and scheduled to be completed in early 1964; it consists of large drydock, repair quay that can be used for fitting out and engine installation of largest vessels, and tanker cleaning and gas freeing installation, workshops and facilities; drydock, gate dock equipment and particularly bilge blocks, which are novel, and services available are described; dock is 1000 ft long from meeting face of gate to head of dock, with 145 ft clear width through gate and 150 ft clear width between alter faces in barrel of dock. (See also Instn Engrs and Shipbldrs in Scotland -- Trans v 106 pt 4 1962-1963 p 157-91)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Clyde drydock project


    Weitere Titelangaben:

    Dock Harbour Authority


    Beteiligte:
    Dagleish, J.W. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1963


    Format / Umfang :

    6 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Clyde drydock project

    Dagleish, J.W. | Engineering Index Backfile | 1962


    Drydock

    Online Contents | 1995


    Drydock lock

    Ayers, J.R. / Burnett, A.L. / Stokes, R.C. | Engineering Index Backfile | 1963


    Curacao Drydock

    Online Contents | 1994


    Drydock magazine

    TIBKAT | 21.1999 -