Method for ready estimation of tanker construction costs; displacement and installed horsepower are shown to be principal factors in determination of first cost; calculation of operating cost; examples for oil tanker of 40,000 tons displacement and 20,000 shp; prediction of savings resulting from duplication in shipbuilding. Before Soc Naval Architects and Mar Engrs, North California Section. (see also Shipbldg and Shipg Rec v 90 n 3, 4, 5, 6 July 18 1957 p 71-4, July 25 p 114-6, Aug 1 p 146-8, Aug 8 p 177-80)
Cost studies -- Tools for tanker design
Mar Eng
Marine Engineering ; 62 , n 4 ; p 61-67
1957
7 pages
Aufsatz (Zeitschrift)
Englisch