Port Cartier provides year-round shipping facilities for rich iron ore deposits being developed and worked 200 mi inland in northern Quebec; ore handling facilities at port, capable of loading 6370 long tph, provide either direct loading from ore train to ship or from 400,000 ton storage shed; 650 ton ship loader delivers ore from any point on its 870-ft track alongside main dock; design and construction of harbor.
Port Cartier
Can Min J
Canadian Mining Journal ; 82 , n 8
1961
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1962
|Mechanical plant design at port cartier
Engineering Index Backfile | 1963
|Engineering Index Backfile | 1902
|Hydrographic service motorship cartier
Engineering Index Backfile | 1949
ECP Operation on Quebec Cartier Mining
British Library Conference Proceedings | 2001
|