Port is designed to handle ships varying in size from 3000 to 100,000-dwt; concentrate arrives in 125-car trains and is automatically dumped by hydraulic device after locomotives are disconnected; swivel couplings are used; dumping is sequenced with conveying system; concentrate may be sent to storage or direct to ship; reclamation from storage is achieved by means of tunnel belts and vibrating feeders; surge bin at dock facilitates loading; ship loading is by vertical swing boom, retractable shuttle traveling shiploader.
Mechanical plant design at port cartier
Can Min Met Bul
Canadian Mining and Metallurgical Bulletin ; 56 , n 613
1963
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1961
Engineering Index Backfile | 1962
|Engineering Index Backfile | 1902
|Hydrographic service motorship cartier
Engineering Index Backfile | 1949
ECP Operation on Quebec Cartier Mining
British Library Conference Proceedings | 2001
|