Inspection of pipeline - phase 2 includes the following activities: Task (1) One-site training-1 with CP survey equipment delivered to Lietuvos Dujos. This one-site training will be combined with a check of CP installation on a pipeline section. Task (2) On-site training-2 with CP survey equipment. This on- site training with CP survey equipment will follow after remedial work by Lietuvos Dujos, and will be based on the recommendations given in the task 1 report. The performance of the CP-system will be verified after the repairs and other mitigative steps have been made on the pipeline. Task (3) Assistance to Lietuvos Dujos in the preparation of a CP survey report. Guidance will be given as to how results can be evaluated and main findings reported. The task 1 report provides the results of the CP-training and the measurement performed. (au)
Lietuvos Dujos. Inspection of pipeline - Phase 2. Interim report. Cathodic protection, task 1
1996
23 pages
Report
Keine Angabe
Englisch
Cathodic Protection System Inspection 6
NTIS | 1994
|Cathodic protection requirements at pipeline crossings
Tema Archiv | 1997
|