Inspection of pipeline - phase 2 includes the following activities: Task (1) One-site training-1 with CP survey equipment delivered to Lietuvos Dujos. This one-site training will be combined with a check of CP installation on a pipeline section. Task (2) On-site training-2 with CP survey equipment. This on- site training with CP survey equipment will follow after remedial work by Lietuvos Dujos, and will be based on the recommendations given in the task 1 report. The performance of the CP-system will be verified after the repairs and other mitigative steps have been made on the pipeline. Task (3) Assistance to Lietuvos Dujos in the preparation of a CP survey report. Guidance will be given as to how results can be evaluated and main findings reported. The task 1 report provides the results of the CP-training and the measurement performed. (au)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Lietuvos Dujos. Inspection of pipeline - Phase 2. Interim report. Cathodic protection, task 1


    Erscheinungsdatum :

    1996


    Format / Umfang :

    23 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch