Inspection of pipeline - phase 2 included the following activities: Task 1: On-site training with CP survey equipment combined with a check of CP installations on a pipeline section. Task 2: On-site training with CP survey equipment after remedial work has been done, based on the recommendations given in the task 1 report. Task 3. Assistance to Lietuvos Dujos preparation of a CP survey report. Guidance in how results can be evaluated and main findings reported will be given. Task 4: Assistance to Lietuvos Dujos for installation of two CP stations with anodebed. This final report presents the results of task 2, 3 and 4. Only the major results of task 1 are described, thus the results of task 1 is described in details in the Interim Report, September 1996. (au)
Lietuvos Dujos. Inspection of pipeline - Phase 2. Final report. Cathodic protection
1998
28 pages
Report