Inspection of pipeline - phase 2 included the following activities: Task 1: On-site training with CP survey equipment combined with a check of CP installations on a pipeline section. Task 2: On-site training with CP survey equipment after remedial work has been done, based on the recommendations given in the task 1 report. Task 3. Assistance to Lietuvos Dujos preparation of a CP survey report. Guidance in how results can be evaluated and main findings reported will be given. Task 4: Assistance to Lietuvos Dujos for installation of two CP stations with anodebed. This final report presents the results of task 2, 3 and 4. Only the major results of task 1 are described, thus the results of task 1 is described in details in the Interim Report, September 1996. (au)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Lietuvos Dujos. Inspection of pipeline - Phase 2. Final report. Cathodic protection


    Erscheinungsdatum :

    1998


    Format / Umfang :

    28 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch