Global Insight was contracted by the Port of Algiers to carry out the study of the feasibility and necessity of building a second container terminal to handle to growing volume of containers moving through the Port. Global Insight worked with Moffat & Nichol International, a global port engineering and design firm, and with AMISHIP, a local Algerian maritime consulting firm. The First Phase of the study was completed in July 2003 with a presentation on the Study findings to Port executive staff being held on July 29 in Algiers.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Study for the Need for a Second Container Terminal at the Port of Algiers, Algeria. Final Report


    Erscheinungsdatum :

    2003


    Format / Umfang :

    80 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    New port terminal of Algiers

    Engineering Index Backfile | 1953


    Port of Algiers: Mustapha Jetty -- III

    Renaud, P.J.M. | Engineering Index Backfile | 1936


    Port of Algiers: Mustapha Jetty -- I

    Renaud, P.J.M. | Engineering Index Backfile | 1936


    Port of Algiers: Mustapha Jetty -- II

    Renaud, P.J.M. | Engineering Index Backfile | 1936


    ALGIERS

    Online Contents | 1994