The National Park Service (NPS) proposes to construct a new access road from Father Capodanno Boulevard into the north end of the park and to increase the parking capacity for the Miller Field area. A paved pedestrian trail would also be constructed, which would connect the existing trail along Father Capodanno Boulevard to the WWII Memorial and the existing trail located along the east side of Shore Road. The parking improvements include the addition of a new parking area adjacent to the newly proposed northern access road, reconstruction of Parking Lot E, reconstruction of Parking Lot F, and expansion of Parking Lot B to add a third row of parking to the northeast. A pedestrian trail is also proposed at the east end of the Park.
Gateway National Recreation Area, Staten Island Unit, Miller Field Environmental Assessment: Proposed Parking Lot and Entrance Improvements at Miller Field
2006
56 pages
Report
Keine Angabe
Englisch
Administration & Management , Domestic Commerce, Marketing, & Economics , Highway Engineering , Transportation & Traffic Planning , Road Transportation , Gateway National Recreation Area (Staten Island) , Miller field , Access road , Parking lot , Construction , Expansion , Management planning an control , Parking capacity , Pedestrian trail , National Park Service (NPS)
The proposed terminal at St. George, Staten Island
Engineering Index Backfile | 1903
Miller im Sixpack. Kurztest Mazda Xedos 9 Miller Cycle
Kraftfahrwesen | 1996
|Online Contents | 2017
|Entrance-exit interlocking speeds busy terminal operation at St George on Staten Island
Engineering Index Backfile | 1952