The ATS analysis component is presented focusing on methods by which the varied data sources are used by the ATS analyst. Analyst training and initial processing of data is discussed along with short and long plans for the ATS.
The application test system: Experiences to date and future plans
01.07.1979
Aufsatz (Konferenz)
Keine Angabe
Englisch
Keeping up-to-date with ETCS implementation plans in Spain
IuD Bahn | 2008
|Eurocontrol resets B-RNAV date . Siberia Airlines plans radical facelift
Online Contents | 1998
Spaceflight - Arianespace sets Ariane 5 ESA date . Eurockot plans June launch
Online Contents | 2003
Airbus restructuring date slips . American forced to rethink 1999 growth plans
Online Contents | 1998