Reduction of aircraft maintenance costs has been a challenge to aircraft operators for many years. It is well known that powerplant maintenance costs are a significant percentage of these total costs. Douglas Aircraft Co. is using new methods, checks, and controls during the early design phases to guarantee that established goals for the DC-10 will be achieved. Programs have been developed that will result in high system reliability and ensure optimum maintainability. This paper describes the implementation of these programs for powerplants and associated systems.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Douglas Design for Powerplant Reliability and Maintainability


    Weitere Titelangaben:

    Sae Technical Papers


    Beteiligte:
    Jongeneel, J. W. (Autor:in) / Wright, L. A. (Autor:in)

    Kongress:

    National Air Transportation Meeting ; 1969



    Erscheinungsdatum :

    01.02.1969




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Reliability and maintainability

    Online Contents | 1994


    Reliability and maintainability

    Howell, J. M. | TIBKAT | 1995


    Reliability and Maintainability from an Airline Standpoint - ATA Reliability & Maintainability Subcommittee

    Meador, B. M. / Nowlan, F. S. / Roberson, K. D. et al. | SAE Technical Papers | 1970


    Reliability as a Criterion in Nuclear Space Powerplant Design

    Fraas, Arthur P. | SAE Technical Papers | 1964


    Reliability and maintainability barrier

    Brearley, J.M. | Engineering Index Backfile | 1964