Belgian National Railways is resolutely continuing with its 3 kV DC electrification programme that will put 2450 route-km representing 60 per cent of the network under the wires by 1987. Simultaneously, selected trunk routes are being upgraded for 160 km/h operation. Such is the background to the development of a family of electric locomotives and multiple-units fitted with chopper control and designed to run at 160 km/h. The designs break with traditional concepts, and neither the new locos nor the EMUs will be compatible with earlier traction units.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Expanding the fleet as the wires reach out


    Weitere Titelangaben:

    Erweiterung des elektrifizierten Eisenbahnbereichs in Belgien


    Beteiligte:
    Weytens, P. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1982


    Format / Umfang :

    5 Seiten


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Connected Vehicles Fleet Expanding Problems

    Gabsalikhova, Larisa / Makarova, Irina / Shepelev, Vladimir et al. | TIBKAT | 2020


    Expanding reach, capabilities of balloon systems

    Debora Fairbrother | Online Contents | 2016