A joint industry project (JIT) plans to employ coiled tubing (CT) from the deck of a vessel to deploy and install anchor points for mobile offshore drilling units requiring deepwater moorings. CT offers significant advantages for installation of anchor points. It provides the means for deploying anchors to considerable depths in the seabed, as appropriate to provide the necessary retainment force. CT technology offers pin point accuracy with reference to the mooring pattern center, rapid and accurate anchorage deployment to significant depths into the seafloor, very high ratio of pull-out force to weight of anchor equipment, and reduced difficulties in transportation and handling and therefore increased safety for anchor personnel.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Deepwater mooring system using CT technology


    Beteiligte:
    Head, P. (Autor:in) / Turner, D. (Autor:in) / French, D. (Autor:in) / Atkins, W.S. (Autor:in) / Hanson, T. (Autor:in) / Cameron, G. (Autor:in) / Hess, A. (Autor:in)


    Erscheinungsdatum :

    1999


    Format / Umfang :

    9 Seiten, 9 Quellen


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch




    Advanced deepwater mooring

    Cuthill, D. / Kobiela, M. | Tema Archiv | 1999


    Deepwater permanent mooring cables

    Sefton, S.L. | Tema Archiv | 1999


    Deepwater mooring and drilling

    American Society of Mechanical Engineers | TIBKAT | 1979


    DURABILITY OF POLYESTER DEEPWATER MOORING LINES

    Berryman, C. / Banfield, S. J. / Flory, J. F. | British Library Online Contents | 2007


    Deepwater mooring polyester cable reversing method

    WANG ZHIFENG / YE YONGBIAO / CUI NING et al. | Europäisches Patentamt | 2021

    Freier Zugriff