This report was prepared as a final planning document by the U.S. Army Corps of Engineers, Buffalo District for the final feasibility study of navigational improvements at Olcott Harbor, Niagara County, NY. It summarizes considered and proposed plans for small boat navigation improvements at Olcott Harbor; identifies potential environmental and socio-economic (beneficial and adverse) impacts associated with the plans; identifies proposed mitigation measures; summarizes the assessment and evaluation of the alternative plans and coordination and views of other Federal, State and local agencies and the public. (Author)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Small Boat Harbor, Olcott Harbor, Niagara County, New York


    Erscheinungsdatum :

    1978


    Format / Umfang :

    235 pages


    Medientyp :

    Report


    Format :

    Keine Angabe


    Sprache :

    Englisch




    Olcott Harbor, New York, Design for Harbor Improvements: Coastal Model Investigation

    Bottin, Robert R. Jr. / Acuff, Hugh F. / United States. Army. Corps of Engineers. Buffalo District. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1990

    Freier Zugriff

    Current and Temperature Effects at Eighteenmile Creek as a Result of Harbor Improvements at Olcott Harbor, New York: Hydraulic Model Investigation

    Bottin, Robert R. Jr. / United States. Army. Corps of Engineers. Buffalo District. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1990

    Freier Zugriff

    Rubble-mound breakwater wave-attenuation and stability tests, Olcott Harbor, New York ; coastal model investigation

    Carver, Robert D. / U.S. Army Engineer Waterways Experiment Station | TIBKAT | 1991


    Rubble-Mound Breakwater Wave-Attenuation and Stability Tests, Olcott Harbor, New York: Costal Model Investigation

    Carver, Robert D. | HENRY – Bundesanstalt für Wasserbau (BAW) | 1991

    Freier Zugriff